1/6

-REMOVED BENT LACING AND WELDED IN A NEW ONE

-THIS CRANE WAS ON A BARGE. TO COMPLETE THE REPAIR, THE 300 FEET OF BOOM WAS LOWERED ON TOP  OF TWO OTHER BARGES & STRAPPED DOWN. THESE TWO BARGES MOVED INDEPENDENTLY FROM THE BARGE THE CRANE WAS ON  AND MADE FOR AN ADDED CHALLENGE AS THEY WERE IN CONSTANT MOTION DUE TO THE WAVES FROM THE TUG BOATS COMING IN AND OUT OF THE DOCKS.

PROJECT 03

LATTICE BOOM

CRANE REPAIR